Annual Development Proposal - 2019

184 Baddegama North

Development of the road from Gangare Bodhi to Meegahaliyadda
Concreting the remaining part of Bantamulla up to Gantara to Vintage
From Makandura to Vinthampiya, the rest of the road is being developed
Concrete the Teakawathi main drainage network
Concreting the remaining portion of the Meegahaliyadda drainage system
Preparation of the drainage system near the Unapadura junction

184 A Nayapamula

Concreting Mahawatte road 200 meters ahead of Ranjith's house
Concreting the remaining portion of the Atithikaha Dahuwa road 150 meters
Construction of drainage and drainage roads with two sides of the road at Kandaduwa Road. Construction of two side concrete drainage system.
Construction of a drain system for Gunananda Mawatha
Concreting the road from Gaminagoda Tea factory to the canal
Construction of a small bridge at the Galaboda Canal near the Nayapamula Expressway

184 B Baddegama New Town

Concreting the remaining portion of Manageeg Estate, Palawatta road.
Concreting on 100 meters of Muththettatta-Kudagoda road
Putting tar in the road up to Chithchadeva Balika Vidyalaya from Jamburugaspita to Vintage.
If the Gin gardens are not damaged due to damage, the road to Churches' Girl's College will be tarred ash. (Near the Pothupitiya Shopping Arcade)
Putting tar in the road to churches, 200 meters.

184 C Kotagoda

Concreting the Red Cross Pradeshiya Sabha road (Length-150 meters width 10 feet)
Concreting of Bingedaradawatta Pradeshiya Sabha road (Length-150 meters width 08 feet)
Concrete the Kogagoda Yota with the cobra to the Kotagoda Karaiva road in the Kotagoda Karaiva road (220 meters wide in length - 8 feet).
Rehabilitation of the Younvi Mawatha road (Length-200m width 08 feet)
Construction of the Anura Kumara Vala in Walapotugoda and reconstruction of the road
Concreting from Walapotugoda Waththa to Udumulla road (200m width in length - 08ft)

186 Baddegama East

Concreting the remaining portion of Elankankadu Kanda road (700m)
Concreting the rest of the road leading to the Samadhi ashram (700m)
Concreting the remaining portion of Lewehena road to Pollonnaruwa chena. (800 meters)
Concreting Kukmuluwalduwa Road
Minuwangoda Heenpandeniya Road and a filling of soil (500m)
Mahahena side road concreting about 500 meters and 2 culverts.
The rest of the road along the Lawheehena road, Kattagall fishing (300 meters)
Concreting the remaining portion of Cinnamon Garden road (500m)

186 A Indurupathwila

Concreting Bantaya Ambalantota up to Duwa Waththa temple (500m)
Concreting Kosgaha Kanda from Juse Appu house to Jaj. Ariyadasa's house (200m)
Construction of the bubble road (400 m)
Concreting Waturuwathawatta Road (from Heil Garden Tea Factory up to Indurupathwila District 600 meters)
Concreting Balangoda road
Concreting Yotanduwa road 100 meters
Putting down the junction of the Temple road in Yalatuva
Carrying out the renovation of the tar trenches of Samurdhi Mawatha and mini culverts
Concreting Moderiheenwatnwatta road and making culverts.
Carpeting of the Wanduramba, Baddegama main road (within the domain)

186 B ​​yahaladuwa

Concrete the Sooriyakanda road.
Concreting Kiriwila Wedduwa road
Concreting lake middle lake road.
Concreting Kalawapadagoda Baduduwaththa road
Rehabilitation of the culvert near the road leading to Sooriyakanda.
Reconstruction of the expressway along the expressway.
Launching of culverts to two locations in the highway in the Alhambra.

186 C Ellakanda wathurawa

Concreting the remaining portion near the house of Mr. PK Ruwan (distance 250m)
Karawewa road Concreting of the entire road from Pottmadasa's house (distance 75m)
Concreting Wathurawatta SH Dishanthi Mala from the house (distance 250m)
Concreting the remaining portion of the residence of Mr. BHK Rohana from Wathurawatte by road (distance 200 m)
Concreting Sinkalawuwa waththa road (350m distance)
Construction of the bridge at Ellakanda Watta

186 D Weihena

Reconstructing Wahugalakanda road (2 km)
Reconstruction of the Community Hall entrance road. (200m)
Reconstruction of the Wahhena - Gahalkadadeniya - Rawulahakanda road (1.5 km)
Reconstruction of Lahalugahanduwa road (1 km)
Rehabilitation of the rest of the Jayasekara Mawatha (1.5 km)
Reconstruction of Wathurugaha Estate Road (500 m)
Reconstruction of Sarapuwathura road (1.5 km)
Reconstruction of Burseldeniya road (1 km)
Reconstructing Baddegedara waththa road (1 km)

187 A Pilagoda 

Concreting the rest of the Parathakada road
Concreting the remaining road from Papapola to Idurupathivila road
Papal Kanda Road (from Samantha's house to Aruna's house)
Concrete laid on the house of Mr. Hakmakman's house from the house of Amaraswansa
Build up the Parakada dam and complete concrete road with culverts

187 B Mahahengoda

Reconstruction of the remaining section of Parathakada road in 500m
Developing the remaining portion of the Halhalkadeniya road in Usgaluwada 200m
Rehabilitation of the road at Gelegoda 1km
Reconstruction of road up to community center, Usgalduwa 600m
Developing the road near the Ashoka Forest plant 75m
Development of the rest of the Panagoda road in the 65m
Heenpatha Estate to reach a culvert on the road through Yahaladoda. [20 feet by 3 feet in diameter]
Development of road near Boralukada Express Bridge 100m
Upgrading left road 800m
Developing the road near Mahiyangoda Estate, Nalin Jayasekara. 20m
Construction of the bridge connecting the Galagoda Dampagoda bridge [60 feet length 12 feet wide]
Construction of bridge connecting Galagodaulodhigawatta [50 feet long 08 ft. Wide]

187 C  Thilaka Udaga

Concreting the Thilaka Udagama -Kissideniya road
Concreting the road up to the Junction junction Nilaseewana office.
Concreting the road running under the Sri Premarathna Buddhist Temple.
Concreting by road at Sri Pemarathana Buddhist Stage, by road.
Concreting the balance of Kandehenadeniya road
Concreting the cashew-gaza road
Concreting Pambahena road

188 Hemmeliya

Concreting the Ganga Addara Road from Premadeniya to Premasiri.
Concreting up to Udawakanda Thilak home

189  Mabotuwana

Concreting the Outer portion of the road from Mabotawata to the 300m.
Developing the 700 km road in Kirinarchadeniya starting at Megabotana.
Developing the remaining part of Nattewela road via Halkatwatte, Mabotuwana.
Developing the rest of the Kirimetiyawala road across Helfathwatte Mawabotuwana.
Developing the rest of Lahamulla Nattewela road from Mabotuwana Konesekay road.
Development of the remaining part of Beliaththahena colony road.
Developing the rest of the Mabotuwawa Moragahahena road.
Development of the rest of the Girisudumulla road in Mabotuwana (200 m)
Concreting part of road from Mabotuwana Kandakade to Nawala. (500 m)
Developing a by road from Mabotuwana II Post to Gugong Gahananda (01km).

189 A Naththewela

Concreting the balance of the Deltividad Mabototuwa road.
Concreting the road up to Davidson estate across Heen Oya.
Concreting Habaraduwa - Heraliagaswatta road
Concreting the rest of the Kirimetiyawala road.
Concreting Cashew Mulana road from Dedasa shop near Kosgahola.
Concreting the balance of the Abagahawatta dola highway.
Concreting the balance of the road on the Wegegoda Kanda road.
Concreting Lunuwila - Mabotuwana Road
Concreting the Kaluwana road
Concreting Kithulhena Deniyawa road
Concreting Kodiyaya Road
Concreting Panvila road
Concreting rain water from Cashew Mills.
Concreting Amagahakumbura Maragas Mulana road
Concreting Dangha Ovita Makumbura road.

189 B Thalawa

Concreting the road from the Thimala Nihinigala main road to the lion of the lion area (300m)
Concreting Thalawa Lion Dolala road (500m)
Concrete the Thalawa - Gabalagoda road (1km)
Development of Thalawa Kudahena road (300m)
Development of the safety fence at Thalawa Primary School.
Concreting the Meerankanda road through Thalawa Kudahena.
Development of Mahadu road (800m) from Thalawa Vedakade.
Developing the by-road to Thalawa Rathattahena Vedagedara (500m).
Concreting Thalawa Dushawa Swabia by road (300m)

190  Ihala Lelwala

Rehabilitation of Galpatha Vihara Mawatha
1.75 Km. Concreting of Hindapoddeniya road
Conclusion of Rahula Mawatha Remaining 100m
Concreting the remaining portion of Rahula Mawatha, Hikgappitiya Watta
Concreting the remaining part of the Mahagedara Poththama road
Concreating the balance of the road at Keenagahawatta Widanagewatta. 20m
Concreting the Goaliyawatta entrance road. .125 meters
Concrete laid on Patthinigawatta road .125mm
Rahula Mawatha with the tarpaulin re-tarred
Reconstruction of the bridge across the Galaboda canal on the edge of the Kanaththa garden on the edge of Egoda.
Reconstruction of Aricindiaduwa Bridge at Wanduramba Baddegama main road

190 A Kumbalamalahena

Neil de Alwis Mawatha carpeted.
Repairing of the defect bridge at Kumbalmahalena Junction.
Develop the road from Hindapoddeniya to the jacket.
Concreting Jambugahawila road about 400 meters.
Concreting yamahalagama village 75m on the main road.
Concreting the third and fifth byroads of the youth Village.
Concreting Gamaweville road about 100 meters.

190 B Panwila

Fortuwatta - Construction of the collapsed bridge in the school road.
Concreting Udayagama low-lying road (near Mr. Ratnapala's house)
Concreting the balance of the Udaragama main road.
Concreting Deiyandara Estate road.
Concreting the cross roads from Udaragama main road.
Concreting the right side of Millagaha watta
Concreting the balance of the Lower Panviligoda waththa road.
Concreting the remaining portion of Lelwala Watta Galapatha temple road and preparing the culverts near Muturumalingam's house.
Concreting the Lelwala cross road (near the Ponnamperuma home)
Concreting the road near the Lelwala welded tower.
Concreting the road near the Lelwala Estate Kitul House.
Concreting Panvila Halwathuruduwa road

191 Pahala Lelwala

Reconstruction of the road up to Gondara Sanasa Society up to Kirindalahena Wewa.
Development of Kurukanaththa Delgasduwa Road
Reconstruction of the road from Galkadulla to Mahadeniya.
Concreting the remaining part of Duwawatta Estate Polgahawila Road
Concreting the balance of the Habakkala Dolahaheena road
Concreting the 05 acre road from Ranjith's residence.
Concreting the rest of the Kanaththawatta duahahena road.
Reconstruction of Kassapa Mawatha
Reconstruction of road upto Dalamahena Dalumaduwa
Concreting the rest of the road up to Kirindaalahena near Dalumuwa Dalumaduwa.
Concreting the river pass road at Lower Lelwala.
Concreting by road at Galkadahara

191  A Kokawal

Concreting the road from the Alaskade to the Weliehena, Kokawala Veediahena road (2.5km). Along the same road, laying the roadway and resting the road to Veyahena. In addition, repair the starting part of the main road.
Concreting Dangahadeniya road from Kokawala temple (500 m to Kokawala central road)
Concreting the Udidulla road of Welideniya (from the tea plantation at Hena Kanda)
Construction of Waynekkakanda road in the Kala Kela road.
Concreting the balance of the six acre road (800 m)
Concreting the balance of the road from Akkaraipattu (700 m)
Concreting of the road to No 01 Kokawala Weliedeniya road (1 Km)

191 B Polgahawila

Concreting the Nagas Kandawala road, Bundella, Udadeniya
Concreting the Polgahawila Kandagoda road
Concreting road Polgahawela
Preparation of two culverts from Polgahawila Transformers to Galagawa Gedara Estate

191 C Deiyandara

Concreting of the remaining portion of Kotegoda road
Concreting the Purauruhena road near the Police Station
Concreting the road near the council of Chamin Preschool
Concreting 12 acre rounds per acre
Concreting 1st and 2nd Cross Roads at Acquisition 12 Acquisition Road
Concreting the remaining part of Kekilla Kanaththa road
Concreting of Welckanahena Kekillakanda road
Concreting balance of the Ambalan estate road
Putting tar in the school road
Concreting the road near Ananda's residence, "Pragathi Uyana"
Concreting the progress of the Vihara Mawatha
Progathiyata Uyana Concreting Center Mawatha
Concrete the bowser road
Concreting the stone from Deiyandara road on Kiribathgoda road
Concreting Deiyandara Kebikanda road

191 D Kirindalahena

Kirindahelahena main road (1.5km) with tar repaired.
Repair the road from Pela Lelwala to Dodangoda mawatha, Kirindahelhena (2km).
Concreting of Dondoluwa, Pilagoda road (1.5km).
AP road on the main road. Construction of side bridges along the road with a culvert in front of Gamini's house (culvert length 20 feet, width 12 feet)
Concreting the remaining portion of the Mahaweliya, Walawakanda road (200 m)
Developing the remaining portion of Kirindalahena school road.
Concrete the Kirindahalena Kosgahakanda road.
Development of a by road near PGGunadasa's house (500 m)
Developing the rest of the Kirindalahena Pilapitiya road from KP Alwis' house (500 m)
Develop a by-road in front of Mr. V. G. Thilakarathne's house.
Concreting Mahadeniya Wewa Round Road (500m).
En.em.ḍī.es. Concrete the side by side of Bandusena's house (200m). (Rest)

198 Ganegama North

Concrete laid on Ganegama North Sri Upasena Mawatha up to Ithola Vella road.
Concreting Bolala-tupuwa road near Amaradasa Munasinghe's house
Concreting Koskala Katyaya Road .K. Ariyawansha's house
Concrete the road in front of the Community Hall
Concreting Metagamgha Buddha statue up to the house of Mr. Samarasiri Munasinghe
Widening the bottom line of the Sri Pahula Chaithamaramaya
Concreting Geegahagewatta road
Concreting near the residence of Bambarawana Kanda LLU Shantha from the house of GKMahinda pahath Mahath
Thalapitiya road Concreting Mr. Susantha's house
Concreting the remaining area of ​​Lalvanegoda about 75 meters

198 A Baddegama South

Concreting the Baddegama South Kapugedara Estate Road -100m
Concreting Thummoldawatte road in Godakawela road in Godakawela, Gothatuwa. -80 m
Conclusion of Hingurakgoda Estate Galhena Road -25 m
Concreting the Caberosagoda drainage system -60 m
Concreting the Kabarawassagoda road -100m
Putting tarred on the road to Palamulla
Concreting Puhulduwa road -100m
Putting tarred hangers on tarragon -800 m
Concreting Mudagewatta road -50m
Concrete on Dewawatta Road -75m
Concreting of Suwandurugodawaththa Palamulla road -100m
Concreting Panganhelamulla road -100m
Concreting the culverts with bamboo -100m
Concreting Dampagoda Ketegahawattha Road -60m
Putting tar in the Kentagoda Temple -60m
Rehabilitation of the bridge at Sripada-Godalla road and an alternative route to Hikkaduwa via Gothatuwa. Length 15 widths and 12 beneficiary families
Concreting the access road to the fertilizer storage at Baddagma Agrarian Service Center

198 B Gothatuw

Concreting Balawalawatta Wellhta road
Concreting Liyaduwa Ruhunu Veleya Yaya road
Concreting Kanaththa-godunanda Kurunda road
Concreting Gothatuwa Malapalawatta Road
Concreting the Oluvila Wellhtota road.
Concreting the second lane of Malapalawaththa, Gothatuwa.
Preparation of drains system from Bouthandagoda Kanda to Sri Upasana Mawatha.
Construction of the boundary wall of the Liyanauduwa

199 Halpathota

Road side of Ruwan Pathirana house in Kahagagama Mawatha.
Concreting Gorakahageduruwatte road
Concreting of the road to Uyotogoda Estate
Concreting the road across the bunth of the Kopiwatta.
Kahandagama Mawatha repairing bare bridge.
Edwin Karunarathna Mawatha repairing the bitumen.
Concrete the road in front of Mrs. Leela Nanayakkara.
Concreting of unconfined area on the route
Concreting the remaining part of the road towards New Berilla on the Hapattota bunge.
Rehabilitation of the culvert in the initial place of the Dehihinda Road and the drainage system.
The culvert in the DehihtaHana road is not safe.
Refurbishment of the culvert at the beginning of the cripwatta road.
Make a bridge in place of the culvert on the road to Manamparami near the Community Hall.

199 A Halpathota Central

Development of access road to Pedru Phillipotha near Vavulagala Sri Saseka-Jantharama Viharaya.
Reconstruction of the access road to the public cemetery.
Development of the first lane of the Namal road using concreted concrete.
Development of new road from Borella watta.
Development of road from Pedreduwatte main (Children's home to Ampegama)
The rest of the road along Mauwana road (protected dam) is developed with concrete.
Development of new urban inner road with concrete.
Concreting the rest of the road towards Namal Place by the stone lease. Full
Development of Kekunagoda entry road with concrete.
Reconstruction of the Aradadda road

199 B Wawulagala

Elapalawatta road concreting 120 meters (near Kalpage's house)
Concreting the proposed official sandeepa at Galewadake road 50 meters.
Application of concrete pillars on either side of the Neil de Alwis
Concreting Alapola Estate, Shanthe area 100 meters.
Application of culverts at the Alapalawa Estate on the St.

200 Meda Keembiya

Concreting road from Handangoda to Warakpitiya Kanda
Concreting the road from Meegahawatte to Warakapitiya Kanda
Concreting Puwak Estate from Delgahawala Kanda road
Concreting Paluwathta Warakpiti Kanda road
Concreting the road from the backward of Uluwattale Gedara to Dodangoda
Concreting the road from Maddegewaththa to Warakpita Kanda
Rehabilitation of tarred roads in Matugolana road
Concreting Maligahawatte to Handigakenna Estate
Concreting the remaining portion of the Manigahawaththa citrus park
Concreting the remaining road from the Dedelawaththa to Citrus Garden
Concreting road across Kopiwatta
Concreting the balance from Puwak Estate from the road
Concreting the by road from the 9th mile post
Concreting the rest of the Varadapiti Kanda road in Kambi Kanda
Concreting road from Mahawatte to Warakpita Kanda
Construction of a bridge across the canal from the Dedewatta to Galduwa
Construction of a bridge across the stream across the coffee house
Preparation of four cogged cylinders up to a road up to Palkowatta to Delgahawala Kanda
Application of a culvert on three cylinders to the road through a coffee garden
Placing four cylinders from Devalwatta from Galduwa Road
Using a culvert of four cylinders near the house

200 B Pitiharawa

Concreting the balance of the road at Gamakanda.
Concreting Pihirawa 50 acre road
Concreting the balance of the Uggal Petht Pitigahawa road.
Concreting the remaining portion of LoDhena road.
Concreting and construct the Pitithahara Cooperative Shop to Daluggala Temple.
Concreting balance for the rest of Millagas Udulda road in Dalugala.
Concreting the road near LAJ Shelves tunnel.
Concreting the Uggal Poththa Road from the houses of Mr. Umaul Dela Elesinghe
Concreting of Welkanahena Road, Kalpani Mawatha, 200m.
Concreting of the road from Walkanahena Wandanaaya to 200m.

201 Keradewala

Concreting the remaining 300 meters in Pambaketiyagoda waththa road

201 A Ginimellagaha west

Construction of the Paladuwa Bridge
Rehabilitation of tarred section of Bogahawatta Road
Reconstruction of the Cinnamon Park Road
Construction of the road running along the road section of the Trade Section
Construction of the highest unassembled section on vocational training
Construction of the road in front of Cyril Mendis's house
Construction of the road up to the new building of Thuththidirodu
Construction of a well near the brick work near the Jayathilakkarama temple

201 B Madolduwa

The remaining part of Golden Threese Road is 350 meters
Concrete laid at Kekunduwawa Road
Construction of a 200 meter lane on the Mahagedara Poththa road
The rest of the village of Gammedda Deniyaya has about 75 meters of concrete.
Construction of 75m concrete road to the residence of Mr. Nihal, Wanduwela.
The rest of the road at Henagedara Estate is about 75 meters.
Upper side of the mountain on the Gini Mullegaha road, 50 meters side of the road and 80 meters of concrete is laid out.
Mr. Madoluwa Tissa, Mr. Speaker, 150 Metric Coating.
Application of culverts through Gammeddeeya through the paddy field

201 C Weweldeniya

Concreting the remaining portion of Minteriya Dias Mawatha with byroads (left bank of the Gattallawatta road, Minneriya Dias Mawatha Duwa dam in the road, Sunil Dayaratne's house rest front). All about 500 meters
Concreting Dolahenawatta road 600 meters
Approach to the proposed Nil Sankalvela road (Calderadan Road) is roughly 50 meters tarred
.With the 75 meters of the Vanandavil Golden Terrace
Concreting Minterius Dias Mawatha (adjoining house of Yasa Gamage) and resting approximately 75 meters
Concreting the road from Himalakeli Watta, Sunil's house
Road from Weweldeniya to Diyakadiththa Waththa Sarana Pahala Mawatha
Marjoadana College was reconstructed in front of the road and reconstructed the drains on either side of the ground.

201 D Bataketiya

Halpathota Maywana Road
Development of concrete section with a distance of about 200 meters.
Development of concrete with a distance of 700 meters up to the new bridge from Kochchakala.
From Chaldanathan's residence to Mr. Lal's house, he tarred for about 650 meters.
From the little boy's shop, the road is to be constructed with concrete up to 100 meters.
Mahagangoda Road, developed with concrete up to 150 meters of the road.
Improving the rest of the Daminigawatte road road with concrete road with 250 m distance.
Ratnakolawatar Road, Wattala
Bentota road development road with concrete surfacing up to 100 meters.
Puwakwatta Road Road with concrete surface of 100 meters.
The trunk of Nalaka Sandaruwan Mawata is being tarred
Reconstruction of Naththuduwa road (about 300 meters)
Concreting the rest of the dam of the damulla road.
Mr. Lal's residence from his residence to the residence of Tilakaratne.

202 Majuwana

Halpathota Maywana Road
Development of concrete section with a distance of about 200 meters.
Development of concrete with a distance of 700 meters up to the new bridge from Kochchakala.
Mr. Chaladanath's place of Mr. Lal's house was tarred for about 650 meters.
From the little boy's shop, the road is to be constructed with concrete up to 100 meters.
Mahagangoda Road, developed with concrete up to 150 meters of the road.
Improving the rest of the Daminigawatte road road with concrete road with 250 m distance.
Ratnakolawatar Road, Wattala
Bentota road development road with concrete surfacing up to 100 meters.
Puwakwatta Road Road with concrete surface of 100 meters.
The trunk of Nalaka Sandaruwan Mawata is being tarred
Mr. Lal's residence from his residence to the residence of Tilakaratne.
Kalyani's crate.
Put a new culverme on the main road near Cinnamon Gardens.

202 A Lelkada

Concreting the balance of the Bataduwa road.
Layanaperiya road blocking
Concreting Alawatugoda road
Concreting the rest of the Wanni Gewatta road
Concreting the balance of the Bogahawatta Road.
Concreting the balance of the Pelawatta road.
Development of Kookulwatta by road

203 A the Ginimellagaha South

Rehabilitation of DP P Jayasinghe Mawatha (Randewatta Road) about 560 m.
Concreting the balance of the Pathiniginwatta road for about 60m.
Construction of Drainage System near Hadigahagoda Community Hall.

203 B Dodangoda

Preparation of the balance from Udawatte to Wadeyawatte (length-m: 200)

204 Thellikada 

Concreting the remaining part of the Pinangoda road 100 meters

204  Thelida Town

Concreting about 50 meters in the Thotawatta road
The remaining part of the Thimbirigasyaya road will be 50 meters
Construction of side wall at Ganegoda Road.

205 Horagampitiya

Construction of concrete at a distance of 180 m from Mulana Kanatta road (This road traverses the paddy fields and the owners of paddy fields are unwilling)
Rehabilitation Road from Deepagoda Community Center to Deegoda Watta about 165 m.
Rehabilitation of 80 m track from Kalligoda Estate near the Dupla Community Hall.
Rehabilitation of road from Kurugunda road leading to Kuliyagoda Garden Bantamulla near Dharmaloka College, Horagampita.
Concreting road by road from Deepagoda Budhudera to Dionoda Community Hall.
Concreting Tedduwatta road about 150 m.
Reconstruction of the access road at Horagampita Sri Gangarama Viharaya
Application of cylinders to drain water in Kuledigoda Estate

205 A Horagampiti Central

Concreting Kudagoda Mudiyansa watta 8 ft. Width 100 meters long
Concreting the remaining portion of the road that was allocated by the government for the "Dehigetagama" Pirabahala road
Concreting the rest of the road near Dulhara Keppa in Dagathegama
Concreting the balance of the Karadawella road
Making drains at Kudagoda Road
6 feet wide and 40 feet in length with bridge bridge at Kanda Katiya

206 Walpita North

Concreting road near Arawaththa's house near Mr. Amagoda Kanda Silva's house.
Concrete on the Kannangara Mawatha in the close proximity of Gamaduwa and concreting the road leading up through Baayighena (a route to use as a flood)
Concreting from Amugoda Kanda road from concreted place (near the house of Mr. Ambaliwara) to Kirawal Pedura
Concreting the remaining part of the road at Guththuku road
Concreting the balance of the Muttetthagoda road
Concreting the road from Kiriweluwa to Makihulla.
The rest of the road leading through the intermediate path to the Rubber Estate through Ukachena
Madamgoda Madusha road (Thirty years ago)
Kannangara Mawatha, which commences near the Daham Saleza Shop (Thanoy 06 years ago)

206 A Walpita South

Construction of the road connecting Bope to Poddala on the Meegoda Road from Balangoda Road to the Poddala road.
"Diyawara Gammana" Concreting of the third lane road on the Diyawara road has been completed and reconstructed and reconstructed the drain system.
Concreting the rest of the cinnamon garden at Gallinda road.
Concreting the road to the village of Sirilagama from Sanasa near the village.
Bounding the two boulders on the base of the two rubber trees, the road was laid out and concreted.
Construction of the Dabategaha-Duwa road from the site where concrete was laid.
Concrete the divisional garden road.
Construction of side by side of Udugampola House
Preparation of the by-road in front of Mr. Manawadu's residence.
Concreting the dam of the dam near Balagoda junction to Alwis garage.
Concreting the rest of the area with caspus near the Kadugaha Dahala to Kandahanguwa road.
Concreting Kadahanawatta road

206 B Balagoda

Construction of a road from Balagoda Ruparatne's house to Gonapura.
Concreting Balagoda Pallepetewatta dam road
Concreting the road near Ubdu well near Balagoda river
Concreting Balagoda Gal Induragoda Kanda roundabout

206 C Keembiela

Concreting of the Abegama Kanatta road
Putting tar in the road up to the residence of MP Premachandra from the house of those who travel along Derekanda road.
Concreting the road up to the house of Mr. Weerasinghe's house near Mr. KHM Ajith's house near Nanda Malani road on the Olimpuscow road.
Conclusion of the rest of the Abegama Welegewatta road.
From the house of Mr. Daya Chandrasiri to the house of E.E.E. Menori, reconstruction of the road.
Preparation of Street Lamps
Providing a permanent solution for flooded areas in Derekanda near Keambi Ella.
Preparation of road by means of cylinders culverts to the point where water is discharged through the Katideniya Pradeshiya Sabha.

206 D Gonapura

Concreting the Kotahena dam ending about 125 m.
Concreting the Rubber Estate up to the house of Prince.
Putting tarred road from Balangoda to Gonapura
Prophylletic dam, about 500 m away from the road, laying corrite soil.
Concreting Polgasduwa road about 100m.
Rehabilitation of school road
Mahawaththa Road by road SGG Concreting Mr. Gunapala's house.
Concreting Weragoda Duwa road about 100 m.

206 E Andurathwila

Concreting the Wawulagala Kanda Road (100m)
Concrete the road in front of the Jagoda Kade road in Weli Estate (00m)
Concreting the road near Kekiriehena WG Gamini's (100m)
Concreting Thudugedara Duwa road (150m)
Concreting the Walpita Estate Kovil Road (100m)
Putting tar in the road from Balagoda Mahakari Garage to Ariyawoti Mawatha (500m)
Concreting road near TG Ranjith's house at Walpita Estate
Concreting road near Bethalthena watta
Concreting the road from W. Gintha Jeevasi's house to Kumara Ananda's house
Concrete the Delgahawatta road in Poddala Junction concreting (100 meters)
Concreting Delgahawaththa road in front of Poddala Police Station (50m to 1000m)
Concreting the remaining part of the house at Cinnamon Garden, Chandrasiri Kariyawasam (30m)
Concreting the road leading to estate houses (100m)

 

207 A Ihala Keemiya South 

Renovation of tar by asphalt road from Paligangoda Junction to the Peak Gas Hatch School
Concreting or excavating the Mahananthananda road
Concreting of the Sugatharama Temple to Dimuthu Mawatha which starts from Sanasa near Kosgahahena and turning road to turning road to the turning point to the Health Center.
Concreting the Nagaha Hena Kanda road to Amarasena's house
Repairing of the road from the four way junction to the Kosgahahena from the Fort area from the Fourth junction to the 500m.
Concreting the balance of the Lankildda Kanda road where the tracks are near the Narangoda Furniture Lane
Concreting the by road from Mahakanda up to Gamagawatte
Concrete the road from Pitigala junction starting at 4.00 pm
Concreting the rest of Jayamini Mawatha from the Kosgahahena road
Putting tar in the new Govilhena road
Concreting Jaya Shakthi Mawatha

208 Pahala Keembiya

Making road from Madinaththa to Warakapitikanda road through the state lands
Concreting the road to Manigage Estate, Galdage Gedara Estate
Concreting the road of the Kokawala road near the house.
Concreting the road leading to the site of the shillerarama vihara to the present place of the official shadow.
Cutting off the road from KA Anandapala Mawatha to Thalpitiya Watta.

208 A Kasideniya

Concreting the balance of the Beliaththa lake in the Kosgahawatta road
Reconstruction of the road from Mahagedara Waththa to Palladola.
Concreting Madugiriya first lane.
Reconstruction of the highway up to the bridge of the Expressway at Maggolpitiya Abhayagam.
The rest of the road across the Kassadeniya new housing project
Concreting Ginoluwa mountain road, Kurunduwatta
Concreting Wawulagala Mavatha road

208 BC Warakapiti Kanda

Concreting Warakapitikanda Madinavata road
Putting a strait in front of the house in front of YP Wijewardene's house
Concreting and side lining of Kassadeniya Thilakudagamana road
Concreting Samagi Mawatha
Conclusion of Millagahawatta Road
Concreting Godegoda-Watta Road
Reconstruction of the school in Chenked School
Construction of a stone fence around the line.

208 C Kohombanadeniya

Development of the rest of the Kohommanadeniya Halkalawilwalikitigahana road (about 500 meters)
Development of the rest of the road at Welikatithheaha Naddumbiya (about 300 meters)
Development of the remaining road from Abhimipipura to Mr. Asoka Chandrasena's house (about 300 meters)
Dodangoda village access road and internal road development (about 500 meters)
Kaluwalakanda road development road (about 200 meters)
Welikitigena road development and internal roads (about 400 meters)
Ī.ṭī.ep. Chamikara Kumara's third phase of the road and the development of internal roads (about 500 meters)
Development of the rest of the Sovisiri Road (about 125m)
Development of Kadijugahawatta road (about 200 meters)
Development of the remaining part of the Udumulla Owitt Road (about 75m)
Development of Kudawella Munamalgahawatta road (about 200 meters)
Polhenawatta road (125m)
Upgrading of the culvert and road development road to Ihalagedara Estate (about 200 meters)
Development of the rest of the downstream of the Hetssarana village (about 100 meters)
Development of the remaining part of the Anguloyawatta road (about 50 meters)

220 Gamegama South

Concreting the left side of the road from the entrance of the carpeting from the entrance of the 20 acres of the village. Ariyadasa's house near the Ariyadasa's house.
Concreting road in front of the water tank 20 acre highway
Concreting the balance of the Cankalanda road
Concreting the road connecting Galkanda to the Ging Ganga and linking the road up to the Valk bridge
Concreting the remaining part of Kamal Mawatha

220 A Ganegama East

Concreting 15 acres of dam in 100 acres
Concreting by road at Kitulgahagoda Kanda UL Balakadasa
Concreting the road near Mr. WLLith's house
Concreting Kithulgahagoda Kanda near the house of KBD Wikmanayake's house.
Concreting Badalgama road on the Baddegama main road at Baddegama
Concrete the construction of 100 meters from the house of the inspector Siriyawathi Jayasinghe.

220 B Ganegama West

Concreting Huntnadeniya Bunter dam
Concreting Thimbirigaghagoda Road
Concreting Gallegawatte-Halhattegoda road
Concrete laid on Servitude-Piyota road about 25 meters
Concreting the road about the aluthy sacred area upto 40 meters
Development of the remaining part of the Vavahena road (near Kumari's house)

220 B Sandarawala

Reconstruction of the road from Pinnaduwa Estate to Duwa
Rehabilitation of road from Rathnagiri Mawatha to Pinnaduwa waththa
Rehabilitation of road from Puhuluwa Watta to Polduwa
Concreting the pillars with a crocodile with Narangodawatta road in Rathnagiri Mawatha.
Concreting road at Suriyadda Puhulwada.
Concreting Green Field road

221 Wanduramba

Concreting the Fiscal Road access road (2 km).
Concreting of the road near the road with the drainage system (2 km)
Concreting the remaining land at Godakumbura Dolalamma (2km) (Siddaththa dam via Dickwella via Nainuduwa)
Construction of side by side of Ambalanduwa by concrete (2 km)
Concreting Dawatagahawaththa road (700m)
Concreting Dhatawella road (2 km)
Concrete the Gadadorakadawila road (1.5 kms)
Concreting the remaining portion of the Mendagodawatta Higgahawatta road (4 Km)
Concreting of Kaluwathawatta road (Mt. 900)
Concrete the industrial estate of Imbulgahawatta, Wattala (2km)
Reconstructing Hettigodawatte Road (500m)
Reconstruction of the bridge connected to the remote island.
Repair the bridge along the Aluth Gedara Owatta Bridge
Aligning 4 culverts on the edge of the road along the road.
Re-laying of 2 culverts of Ambalanduwa road to drain off water.
Construction of 3 culverts on the road from Higgahawatte to Maubotuwana 2 m post.

221  A Wanduramba South

From the Panwila-Nattewela road, reconstruct the road and develop the rest of the road.
Davidson Road Developed
Concreting of the I post, Beliatta thera, upper flank road in the upper flank road
Concreting Naragewatte and Panwila road
Concreting and developing the road up to Panwila to Mulangoda
Concreting and restoration of the rest of the rest of the Illagutanda road on the Wellawaya road
Mabotuwana Road, Gamini Bakery and road upto Rajagedara Estate
Developing the road from Madanayaka to Lunugamvehera through Thunnakithila to Nattewalawa
Development of Polhenawaththa Road
Concreting the remaining part from Panwila to Ilegota Kanda road
Developed from the Panwila Police Station and developed through the Lelwala Estate via Nattandawela
Getting started from Mabotuwana Road, Gamini Bakery Road and widening the bridge on the road upto Rajagedara Estate
Expansion and reconstruction of the Relmulla bridge on the road from Wanduramba, Mabotuwana to Nattewela Kottawa
Preparation of the Thanketiwila culverta near Mabotuwana Kanishegoda Vidyalaya

221 B Gulugahakanda

Concreting the road across Poongamadu mountain to Kosgoda Kanda.
Concreting the new rubber cultivation road near the Nugaheva up and down road.
Concreting the lower road near Buddha Sarana Kade
Concreting the road through Hikgaha Estate to the oranguthu junction.
Concreting the slopes of Pujamu-oya to the Divaina road.
Concreting the houses 20 Musanaya Round Round Road and Kovil

News & Events

15
Aug2018
 Blood donation program

Blood donation program

Blood donation program - Held on 2019.05.08

15
Aug2018
Housing scheme – Pahaloshaulhena

Housing scheme – Pahaloshaulhena

The Preliminary stages of reconstructing the house...